High Speed Shallow Flotation Device - Comprehensive Installation Procedure

Pre-Installation Site Requirements

  • Flat and Stable Surface: The installation area must be level and capable of supporting the device's weight.
  • Adequate Space: Sufficient room for both operation and future maintenance activities.
  • Hazard-Free Environment: Surrounding area should be clear of potential hazards that could impact installation or operation.
  • Component Verification: All device parts must be checked for completeness before installation.
  • Clean Installation Surface: Removal of debris and impurities to ensure even placement.

Installation Steps

1

Site Preparation

Conduct comprehensive site inspection to verify all requirements are met. Clean the installation surface thoroughly to remove any debris or impurities.

2

Component Preparation

Prepare all necessary installation components and tools. Verify that all flotation device parts are intact and complete, including main body, pipeline connections, and auxiliary components.

3

Main Body Placement

Position the main body accurately according to design requirements. Ensure the device is perfectly level to prevent operational issues. Secure it firmly to the installation base.

4

Pipeline Connection

Connect all pipelines including inlet, outlet, and reagent feeding lines. Ensure tight, sealed connections using appropriate sealing materials to prevent leaks.

5

Inspection & Testing

Conduct thorough inspection of all connections, fasteners, and seals. Perform test run to verify operation, checking for abnormal noises or vibrations.