WJY Dosing Device Installation Process

1
Site Preparation

Select a stable, flat location with adequate space for operation and maintenance. Avoid areas with strong vibrations, excessive heat, or moisture. Verify compatibility with local electrical and plumbing infrastructure.

2
Unpacking & Inspection

Carefully unpack all components and inspect for transport damage. Identify each part using the provided installation manual.

3
Mechanical Assembly

Secure the main body using appropriate mounting hardware (bolts/brackets). Ensure the device is perfectly level to prevent internal stress.

Important: Use only manufacturer-recommended hardware to maintain structural integrity.
4
Pipeline Connection

Connect inlet/outlet pipes using compatible fittings. Ensure all connections are leak-proof. For electrical wiring, follow the manual's diagrams and comply with local electrical codes.

5
Control System Installation

Install and calibrate sensors and controllers for accurate dosing. Conduct a preliminary test with a small medium quantity to verify proper operation.

Final Steps:

• Clean the installation site
• Document all installation details
• Train operators on safety procedures
• Establish a maintenance schedule