WJY Dosing Device Installation Process
Select a stable, flat location with adequate space for operation and maintenance. Avoid areas with strong vibrations, excessive heat, or moisture. Verify compatibility with local electrical and plumbing infrastructure.
Carefully unpack all components and inspect for transport damage. Identify each part using the provided installation manual.
Secure the main body using appropriate mounting hardware (bolts/brackets). Ensure the device is perfectly level to prevent internal stress.
Connect inlet/outlet pipes using compatible fittings. Ensure all connections are leak-proof. For electrical wiring, follow the manual's diagrams and comply with local electrical codes.
Install and calibrate sensors and controllers for accurate dosing. Conduct a preliminary test with a small medium quantity to verify proper operation.
• Clean the installation site
• Document all installation details
• Train operators on safety procedures
• Establish a maintenance schedule